Al‐Harbi, K M, Johnston, D W and Fayadh, H (1994) Building Construction Detailed Estimating Practices in Saudi Arabia. Journal of Construction Engineering and Management, 120(04), 774–84.

de Neufville, R and Smith, J T (1994) Improving Contractors' Bids Using Preference Reversal Phenomenon. Journal of Construction Engineering and Management, 120(04), 706–19.

Dowding, C H (1994) Ground Motions and Air‐Blast Effects of Explosive Demolition of Structures. Journal of Construction Engineering and Management, 120(04), 838–56.

Hinze, J and Brown, J (1994) Properties of Soundless Chemical Demolition Agents. Journal of Construction Engineering and Management, 120(04), 816–27.

Lutz, J D, Halpin, D W and Wilson, J R (1994) Simulation of Learning Development in Repetitive Construction. Journal of Construction Engineering and Management, 120(04), 753–73.

McCullouch, B G and Lueprasert, K (1994) 2D Bar‐Code Applications in Construction. Journal of Construction Engineering and Management, 120(04), 739–52.

  • Type: Journal Article
  • Keywords: Two‐dimensional analysis; Signal processing; Data communication; Databases; Inventories; Control systems; Construction industry;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(739)
  • Abstract:
    Two‐dimensional (2D) bar codes provide a greater capacity for encoding data than regular or linear symbology. With recent developments in 2D hardware, this symbology can now be employed in industrial applications. This paper discusses this technology and its applicability in the construction environment. A comparison with one‐dimensional bar codes is made, and advantages and disadvantages are discussed. An explanation of how data are encoded and scanned along with the hardware and software requirements is included. Finally, several construction applications are proposed to illustrate how this technology could be applied in the construction industry.

Naoum, S G (1994) Critical Analysis of Time and Cost of Management and Traditional Contracts. Journal of Construction Engineering and Management, 120(04), 687–705.

Salim, M and Bernold, L E (1994) Effects of Design‐Integrated Process Planning on Productivity in Rebar Placement. Journal of Construction Engineering and Management, 120(04), 720–38.

Semple, C, Hartman, F T and Jergeas, G (1994) Construction Claims and Disputes: Causes and Cost/Time Overruns. Journal of Construction Engineering and Management, 120(04), 785–95.

Songer, A D, Ibbs, C W and Napier, T R (1994) Process Model for Public Sector Design‐Build Planning. Journal of Construction Engineering and Management, 120(04), 857–74.

Stevens, J D and Murray, A L (1994) Modified Roof Erection System. Journal of Construction Engineering and Management, 120(04), 828–37.

Thabet, W Y and Beliveau, Y J (1994) HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects. Journal of Construction Engineering and Management, 120(04), 875–92.

Tommelein, I D, Carr, R I and Odeh, A M (1994) Assembly of Simulation Networks Using Designs, Plans, and Methods. Journal of Construction Engineering and Management, 120(04), 796–815.